Organization: |
URL: |
Country: |
City: |
My Links
ABOUT NEW OFFICE
- Situated at 64, HARTRON Complex, STP, Sector 18, Gurgaon (Next to Hughes office)
- Present construction includes Basement and Ground floor. There is a permission to build another floor.
SUGGESTIONS
- SEATING CAPACITY - Present seating capacity should be about 45 with additional 25 capacity on the first floor.
- SEATING Arrangement - As much privacy to each individual as possible with as much space as possible.
- CONFERENCE ROOMS - 2 small (5-6 ppl) and 1 big (10-11 ppl) on ground floor and basement with additiotnal capacity on first floor
- LUNCH SPACE - There has to be an arrangement for bigger lunch space/modified conference room
- Toilet - Ideally have 2 toilets per floor (i.e every 25 ppl). One of the Toilets should preferrably have a shower also.
- There should be a pantry (It is already there on the ground-floor)
- RECREATION/RESTING Place - There should be a space for recreation/resting and have a library there. The place should be such that one can even sleep in the night if he wants. We've slept enough on floor
- CABIN/CUBICLE Arrangement - There should be at least 2 ethernet points with each cubicle. The height of workstation should suggestively be a little (1"-2") over the current height of 604 workstations. There should be a keyboard tray with enough spcae to keep the mouse also.
- There should be a resting place for the legs under the work-station
- Power points should not only be under the work-station so that one has to bend-down. They should be on top of the workstation also.
- The air-conditioning should be efficient in terms of few ppl staying at night.
- There should be Flooring.
- RECEPTION - (Anybody editing the page, please do not delete this point ) There should be reception with space
My Personal Data
Note: if personal data is being stored using a secret database, then it is only visible to the user and to administrators.